UPPER BROWN HILL CREEK UPGRADE

To reduce the risk of flooding by upgrading the creek capacity at critical sections along upper Brown Hill Creek and upgrading specific choke points such as bridges.
FLOW DIVERSIONS FROM KESWICK CREEK TO BROWN HILL CREEK

To reduce the risk of flooding from Keswick Creek, particularly through Wayville, Keswick, Ashford, Mile End South, Hilton and Richmond.
RIDGE PARK FLOOD CONTROL DAM

To reduce the risk of Glen Osmond Creek flooding through Fullarton and Unley.
LOWER BROWN HILL CREEK UPGRADE

To enable Brown Hill Creek west of Anzac Highway to convey greater stormwater flows including stormwater diverted from Keswick Creek, and reduce the risk of flooding in western suburbs of the catchment.
SOUTH PARK LANDS AND GLENSIDE

Flood mitigation works are required within the Glenside development site and within the South Park Lands to reduce the flow of stormwater in Park Lands Creek.
GLEN OSMOND CREEK MINOR UPGRADE WORKS

To reduce the risk of Glen Osmond Creek flooding through Fullarton and Unley.
BROWN HILL CREEK DIVERSION (DPTI CULVERT)

To enable the Brown Hill Creek crossing of the railway corridor at Goodwood to be relocated as part of the Goodwood rail upgrade.