BROWN HILL CREEK DIVERSION (DPTI CULVERT)

To enable the Brown Hill Creek crossing of the railway corridor at Goodwood to be relocated as part of the Goodwood rail upgrade.
RIDGE PARK FLOOD CONTROL DAM

To reduce the risk of Glen Osmond Creek flooding through Fullarton and Unley.
SOUTH PARK LANDS AND GLENSIDE

Flood mitigation works are required within the Glenside development site and within the South Park Lands to reduce the flow of stormwater in Park Lands Creek.