SOUTH PARK LANDS

In Progress: The South Park Lands project includes a wetland in Victoria Park/ Pakapakanthi (Park 16) and Creek Works in Blue Gum Park/ Kurangga (Park 20). Subscribe for progress updates.
GLENSIDE

In Progress: The Glenside project is being delivered by Cedar Woods as part of the Glenside residential estate. Works include enlargement of the detention basin and installation of 3 gross pollutant traps.
HAWTHORN RESERVE

Complete: The creek has been widened to ensure sufficient capacity to endure a significant flood event. The banks have been laid back in the area of the creek adjacent the Mitcham library to retain a natural setting with native plantings within the creek channel and on the banks.
UPPER BROWN HILL CREEK, AREA 1 EVERARD PARK

Complete: The Everard Park project included replacement of an existing open channel with increased capacity concrete covered culvert. Works were completed on site in August 2020.
RIDGE PARK FLOOD CONTROL DAM

Complete: A flood detention dam constructed within Ridge Park Reserve. These works reduce stormwater flow in Glen Osmond Creek and reduce the risk of flooding in downstream areas. Works were completed in 2015.
BROWN HILL CREEK DIVERSION (DPTI)

Complete: A section of upper Brown Hill Creek was diverted into a new underground culvert, generally along the eastern side of the rail corridor. Works were completed in 2013.